08-001

Sweetwater Beach - Playground Equipment
Project Type: Improvement
Status: COMPLETE 
Scope: Install playground equipment approved by the board in 2007.  This was to be included in the Beach Renovation project approved by the board. Failure of the membership to finance the capitol improvement, the Beach Renovation will be done a piece at a time as funds are available.  

08-002

Sweetwater Beach - Dock Replacement
Project Type: Maintenance
Status: COMPLETE 
Scope:  This project is for the replacement of the boat dock to include new posts, and supports/decking of composite material.  The Board also requested quotations for the floating dock.  The project should be completed in May.

09-003

Sweetwater Beach - Basketball Court Replacement
Project Type: Improvement
Status: COMPLETE  9/08
Scope:  This project is for the replacement of the basketball court to accommodate the playground equipment in 08-001.  This will include a new concrete surface, goal poles, and nets.  The project should be completed in May/June time frame.

08-004

Sweetwater Beach - re-orientation of volleyball court
Project Type: Improvement
Status: Active
Scope:  This project is to re-orient the volleyball court to a north-south direction as part of the plan to renovate the beach. The relocation will move the court a bit closer to left side and toward the water.

 

 

School Board Projects

For more information use the following link (http://www.scps.k12.fl.us)

  Sabal Point Elementary School; Additions and Renovations
  Rock Lake Middle School; Roof Replacement

 

County Road and Waterway Projects

( For more information about these, click the project name in blue and 

this will take you to the Seminole County Web)

 

00192007

WEKIVA SPRINGS RD DRAINAGE IMPROVEMENTS
COMPLETE

00192008

WEKIVA SPRINGS RD INTERSECTION IMPROVEMENTS
COMPLETE
00008302 SWEETWATER COVE TRIBUTARY DREDGING AND DRAINAGE IMPROVEMENTS
Project Type: Storm water
Project Manager: Robert Walter - 407-665-5753
Status: Active
Scope: SEDIMENT DREDGING OF SWEETWATER COVE ALONG WITH STRUCTURE MODIFICATIONS AND LITTORAL PLANTING. (WETLAND PLANTS AROUND THE EDGE OF LAKE) (from WEKIVA SPRINGS RD to WEKIVA RIVER)
00227038 WEKIVA SPRINGS RD PAVEMENT REHABILITATION
Project Type: Paving
Project Manager: Terry Miller - 407-665-5713
Status: Active
Scope: ASPHALT OVERLAY, FULL DEPTH RECLAMATION, AND/OR VARIOUS REHABILITATION METHODS. (I.E. PIPE LINING OR REPLACEMENT, MILL AND RESURFACE). (COLLECTOR) (from COUNTY LINE to HUNT CLUB)
00205302 SR 434 SIX LANING WIDEN FROM 4 TO 6 LANES
Project Type: Roadway Projects
Project Manager: Brett Blackadar - 407-665-5702
Status: Active
Scope: WIDEN URBAN ROADWAY SECTION FROM 4 TO 6 LANES AND REPLACE BRIDGE OVER THE LITTLE WEKIVA RIVER. THE PROJECT LENGTH IS APPROXIMATELY 1.0 MILES (from MONTGOMERY RD to I-4 )